Iraqi Dinar Chat, Information, News, Facts, Guru Forums, RV and Revaluation info

Follow us! Follow us!
+ Reply to Thread
Results 1 to 2 of 2

Thread: April is the completion of the equipment unloading 2/24/2010

  1. #1
    Senior Member ArmyRanger's Avatar
    Join Date
    Feb 2010
    Location
    Texas
    Posts
    123
    Thanks
    0
    Thanked 0 Times in 0 Posts

    April is the completion of the equipment unloading 2/24/2010

    Trade Minister: during April is the completion of the monument equipment unloading of vessels in Basra
    24 February, 2010 11:32:00 24 February, 2010 11:32:00


    Trade Minister: during April is the completion of the monument equipment unloading of vessels in Basra

    He Ministry of Trade and serenity net debt agency that the draft vessels unloading equipment in Basra will be completed during the month of April.


    This came during an inspection visit by the Minister of Trade and agency Safa'Addin net of installing equipment Bahlr Swiss company in Basra the company's overall grain trade. An official source at the ministry, the minister briefed on the progress of the project and the stages of completion, where Eng-based project that You do not finish the project during the month of April.

    He noted that the project is done purely Iraqi cadres through and experienced engineers and jurisdiction, relying on the project plans.

    Net and praised the efforts of the company through working on the completion of this complex project, which brings the benefit of the country, and contribute to the reduction of time and save money in hard currency to Iraq, and contributes to rapid unloading of vessels received by the port. The minister stressed the need to supplement the ministry investment projects that generate the ministry and corporate profits from which can achieve better compete with international companies in this area.


    http://translate.google.com/translate?h ... google.com

  2. #2
    SENIOR EXCUTIVE MEMBER
    Join Date
    Feb 2010
    Location
    South Carolina
    Posts
    741
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: April is the completion of the equipment unloading 2/24/2010

    Thanks for the post.

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts